Gypsum Mine For Sale

The Estimate Gross Value of this Water Soluble (Pulverized Gypsum Resource is $97.41(+/-) per Ton. Production Costs would be $45.41 (+/-) per Ton,leaving the Net Value per Short Ton at $52.(+/-) per Ton.

      Product Sold:

  • 85% Grade Bulk Gypsum for

The Cement industry is purchasing 85% grade gypsum at a 3" minus

  • 90% Grade Bulk Gypsum for

      The Agricultural industry is purchasing

  • 90% grade bulk gypsum
  • 92% Grade Water Soluble (Pulverized Gypsum)

 

Mining Equipment List

• C-12 Crusher & S-5
• Screening Plant
• 844 J Loader -7.75
• 744 J Loader - bucket
• 644 J w extended arms
• 772D Grader - 16ft blade
• Vermeer T-1225 Terrain Leveler
• Radial Stacker & Conveyor
• Drill Machine
• 317 Skid Steer Loader
• Pneumatic Loading System

Transportation Equipment

• 2 – 400D 40 T Articulated Dump Trucks
• T300 Truck w/3,850 gal water tank